03 339 4150

 
 

Service Forms

Inspection, Metering and Livening Request Form


Form TP1

New connections to Orion Network and Metered Temporary Supplies (including three phase Temporary Connections)

Alteration Requests

  • Inspection of switchboard upgrades and mains upgrades
  • Inspection after 6 months disconnection
  • Disconnect and reconnects at distribution box or pole fuse

Please give us a call or drop us an email with the details.


Application for Temporary Supply Form


Form TP3

All single phase temporary supplies to Orion Network.

© 2025 Telpower Canterbury Limited